Cooby Creek Installation photos – from Neil Sandford


 

Neil Sandford took these transparencies as the Transportable Ground Station equipment was unpacked and assembled in September 1966. Larger versions of many of these slides are available.


Cooby Creek

01. Arrival of vans and general assembly.


Cooby Creek

13A. View towards Office & Canteen Vans.

Large, Larger.


Cooby Creek

Here’s a rough panorama made from the above two photos.


Cooby Creek

02. Positioning vans.


Cooby Creek

02A. 40ft Antenna Pedestal on trailer.


Cooby Creek

03. 40ft Antenna Pedestal Dish assembly.


Cooby Creek

04. OCC Center Van moving to position.


Cooby Creek

05. Antenna Assembly with mobile crane.


Cooby Creek

06. Tricky Positioning 3 OCC Vans.


Cooby Creek

07. Backup Structure ready for panels.

Large, Larger.


Cooby Creek

08. Dish erection.

Large, Larger.


Cooby Creek

09. Dish erection – almost there.

Large, Larger.


Cooby Creek

10. Erected. Note hydraulic rams.

Large, Larger.


Cooby Creek

11. Cables ready to lay in ducts.

Large, Larger.


In fond memory of Neil Sandford.
And thanks to Bruce Ekert for delivering the scans.

Images restored and colour-corrected by Colin Mackellar.